Customer Login
Web Hosting with a human touch

Affected services:

  • Colocation
  • Cloud Hosting
  • Dedicated Servers
  • Virtual Servers
  • Web Hosting

Routine Generator Test

Scheduled for Wednesday 14th August 2019 at 11:00 (London)

Schedule/description of work

Our data centre will be performing a routine generator test, during this window services will be at a marginal risk. They will simulate a full mains failure and fully test their backup systems. All sensing and switching is performed by their automatic systems with critical load sustained by the UPS's during the changeover periods, they will retain the ability to revert to mains power immediately if needed. There is a marginally increased risk during this period and the situation will be constantly monitored by their operations team.

Scheduled start time
August 14, 2019 11:00
Duration
4 hours
Status
Finished

Updates

This has been rescheduled from August 05, 2019 11:00 to August 14, 2019 at 11:00

Posted by Martin Woodhouse