All Simple Status Site
Affected services:
Scheduled for Wednesday 8th April 2020 at 11:00 (London)
Schedule/description of work
Our data centre will be performing a routine generator test, during this window services will be at a marginal risk. They will simulate a full mains failure and fully test their backup systems. All sensing and switching is performed by their automatic systems with critical load sustained by the UPS's during the changeover periods, they will retain the ability to revert to mains power immediately if needed. There is a marginally increased risk during this period and the situation will be constantly monitored by their operations team.